Pravin M.

Engineering manager

Saskatoon, SK

À l’écoute d’offres

Ouvert à
  • Temps partiel et quartsMaintenance manager, Engineering managerJour, Soir
  • Temps pleinMaintenance manager
Type d’emploi
Temps plein
Lieu de travail
Sur place · Hybride · Télétravail

À propos

Engineering Manager with 25+ years of international experience across the copper and steel sectors. Experience includes reliability engineering, asset management, electrical and instrumentation systems, capital project planning, SAP-driven maintenance, and team leadership in smelter and refinery environments. Background also includes budget management, shutdown planning, safety focus, and equipment availability improvement.

Compétences

  • Engineering management
  • Asset management
  • Reliability engineering
  • Team leadership
  • Contractor management
  • Budget management
  • Electrical engineering
  • Instrumentation systems
  • Preventive maintenance
  • Condition monitoring
  • Root cause analysis
  • FMEA
  • Shutdown planning
  • Spare parts planning
  • Capital project planning
  • Commissioning
  • SAP
  • AutoCAD

Expérience

Engineering Manager

Konkola Copper mine PLC

2024-08 · Aujourd’hui

Directly accountable for complete operation and maintenance of engineering systems of copper smelter plant and acid sulphur plant including utilities with safety, health and environment as top objective. Work for zero harm culture by implementing safety program and ensure 100% compliance to statutory requirement for safety, health and environment. Conduct monthly safety meeting, management task observation, plant task observations, audit risk assessment with control measures in place, ensure all safety requirement including LOTO and statutory work permit system followed on ground by the team members. Ensure smooth operation of the engineering systems and ensure maximum plant availability with minimum down time. Directly managing a $86M+ combined annual portfolio, including a $36M power budget and $32M annual shutdown, consistently delivering within ±2% of budget targets. Liaising with the local agencies, contractors, suppliers and service providers. Review spares planning, VDA analysis, spare procurement and inventory control. Review and update maintenance plan, monitor PM compliance using SAP system, developed and review SOP and SMP. Drive asset optimization, achieved and sustain equipment availability over 95% by extensive use of monitoring technique like Infrared Thermography, vibration analysis, thickness mapping, oil analysis, chair and conduct RCA, FMEA, monitor MTTR, MTBF for critical equipment.

Superintendent E & I

Konkola Copper mine PLC

2016-04 · 2024-07

Responsible for complete operation and maintenance of the electrical and instrumentation system of copper smelter plant and acid sulphur plant including utilities with safety, health and environment as top priority. Identified and implement various cost saving initiatives that has brought annual saving of $5M. Prepare power budget and maintenance budget, and ensure expenditure are within approve budget. Monthly shutdown planning and execution. Annual shutdown planning and execution. Capex project design, engineering, technical evaluation and ensure smooth execution. Chair department safety meeting and address all issues related to safety with top most priority. Chair RCA meeting for repetitive failure, identify bed element and implement permanent solution. Drive condition monitoring program across the plant. Monitor OEE, MTTR, MTBF for critical equipment and make action plans for further improvement. Review maintenance compliance in SAP, review and update SMP and SOP. Drive cost saving initiatives across plant. Provide technical expertise services to other plant. Liaising with local energy provider, contractors, service provider and vendors. Prepare scope of work, BOM for service provider and provide technical evaluation for the bids. Prepare and review documentation for ISO9001:2015, ISO14001:2015, ISO45001:2018 and PAS99:2012. Do life cycle analysis for equipment, suggest solution to improve life of equipment to OEM, ensure all the improvement is done in new design to get full life value.

Assistant Superintendent Electrical

Konkola Copper mine PLC

2011-03 · 2016-03

Responsible for maintenance of electrical equipment for entire smelter plant including utilities. Implement SAP base maintenance system, monitor work order compliance, review PM strategy, review SOP and SMP. Planning and execution of CRF-1 project. Annual shutdown planning and execution. Critical spare planning and procurement.

Team Leader

Konkola Copper mine PLC

2008-09 · 2011-02

Erection, testing and commissioning of Smelter copper project. Cold commissioning and Hot commissioning. Equipment history and data collection and VDA analysis of spares. Preparing maintenance schedule in CMMS system. Training of subordinates.

Deputy Manager (Electrical)

CHEMAF S.P.R.L. (Shalina Group company)

2007-06 · 2008-09

Responsible for maintenance of electrical equipment for Copper leaching, extraction and electro wining plants and 132/6.6KV substation. Responsible for project execution for copper-SX and Copper Cobalt electro wining plant. Implement Safety first culture across the plant. Maintenance schedule planning and execution, spare planning and procurement, manpower management. Detail design, engineering, erection, testing, commissioning, operation and maintenance of electrical equipment including transformers rectifier sets, power and distribution transformers, 132/6.6 K.V. substation, H.T. switchboard up to 6.6 K.V., numerical relays, PCC, MCC, motors, H.T. and L.T. cables, cable trays and cable trench, LV frequency drives, UPS, emergency DG sets, high mask lighting towers, EOT crane.

Sr. Engineer (E & I-Project)

ESSAR STEEL(HAZIRA) LTD

2006-06 · 2007-05

Responsible for electrical and instrumentation project for 3.9MMT SMP plant. Feasibility study, technology selection, detail engineering. Developed project schedule, budgets, cash flow requirement, engineering documents, and schedules to achieve project deliverable. Reviewed electrical design documentation for electrical power distribution system including single line diagram, schematic, GA drawings, cable schedules, cable tray routing, piping routing, grounding systems, MCC, PCC, transformer, motors, switchgears, UPS and battery charger selection, lighting. Performed detailed engineering calculations fault level calculation, transformer sizing, voltage drop calculation and cable sizing. Review drawings and approved drawings submitted by technology supplier. Review of specifications for electrical and instrument equipment as per IS and IEC standards. Study of P and ID diagram, calculation of Inputs and Outputs, freezing of PLC configuration and remote I/O configuration. Assist procurement department in procurement process for technical evaluation of bids for Electrical and Instrument equipment. Prepare commissioning and 2-years maintenance spares.

Sr. Engineer

Hindalco Industries Ltd. (Aditya Birla Group)

2000-12 · 2006-06

Reviewed electrical design documentation, including load lists, single line diagrams, schematics, cable schedules, tray routing, earthing systems, UPS and DC sizing, battery chargers, GA drawings, logic diagrams, and P and IDs. Performed detailed engineering calculations and validated vendor and consultant drawings and calculations to ensure technical accuracy and compliance as per IS, ISO, IEC standard. Review QA/QC documents and witness factory acceptance test at vendor site. Maintenance and troubleshoot of electrical equipment for Cu-smelter-1 and Sulphuric acid plant. Aim for Zero harm, conduct safety talk with working crew, ensure safety requirements followed on site including risk assessment, lock out tag out, work permit, confine space permit, working at height permit. Hands on working experience for power distribution transformers, H.T. and L.T. panels, PCC, MCC, H.T. motors, L.T. motors, slip ring motors, HT and LT switchgear, DRY and WET Electrostatic Precipitator and transformer rectifier set, AC L.V. and M.V. Variable Frequency Drives and soft starters, UPS and battery charger.

Formation

Bachelor of Electrical Engineering

LD College of engineering, Gujarat University

Certificats et permis

  • Engineer in Training Intl Grad with APEGS in process
  • ERB NO. 003170
  • FIRST AID
  • NCH 2870/16
Écrivez-nous
Repentigny QC

Comment pouvons-nous vous aider?